Capital Improvement Projects
Sullivan Rd. Improvement
- Reconstruction of S. Sullivan Rd. from E. Sprague Ave. to E. 8th Ave.
- Anticipated construction dates: 05/22/23 – October 2023
- No turns from 4th onto or off of Sullivan
- Access local businesses through the work zone at designated entrances.
- Traffic devices will direct traffic through work zone.
- Project Contact: Kelly Lynch (509) 720-5001
- Contractor Public Liaison: Jamie Pannell (208) 966-0444
8th Ave Improvement
- Repaving, Stormwater, sidewalk upgrades between Carnahan and Park Rd
- New Sidewalk on north side of 8th between Thierman and Park
- Anticipated construction dates: 06/20/23 – October 2023
- 8th Ave intermittent flagging between Carnahan and Park
- Project Contact: Kelly Lynch (509) 720-5001
- Contractor Traffic Control Contact: Kathleen Herzog (509) 828-0814
Barker Rd at Union Pacific Railroad Crossing - Phase 2
- This paving project widens Euclid Ave and Barker Rd at the crossing of Union Pacific Railroad (UPRR).
- The project includes the addition of turn lanes; water, sewer, & stormwater utilities; a sidewalk on Euclid Ave.; and completion of the multi-use trail on Barker Road north of Euclid Ave to Trent.
- This final phase of the Barker Rd widening project requires coordination with the UPRR to replace the railroad tracks and crossing equipment.
- Anticipated construction dates: July 17th – October 2023
- Barker Road will be closed to through traffic for the duration of the project at the intersection of Euclid Ave in the vicinity of the Union Pacific Railroad; and Euclid Avenue will be closed between Barker Rd and Harmony Rd.
- Traffic devices will detour traffic around the work zone.
- Access will remain open for local access.
- During construction of the multi-use trail on Barker Road north of Euclid Ave to Trent, traffic control for a lane shift will be utilized to direct traffic through work zone.
- Contractor’s Public Liaison: Elyse Shattuck (208) 449-3377
- Project Contact: Kristen Armstrong (509) 720-5070
Broadway and Park Intersection Improvements
- Reconstructs the existing intersection with concrete pavement, replaces old signal system, storm water improvements and new sidewalk on the west side of Park Road.
- Anticipated construction dates: August 8th – October 2023
- One lane in each direction will be provided on Broadway.
- Park Road between Broadway Ave and Cataldo Ave will be closed to through traffic.
- Park Road between Valleyway Ave and Broadway Ave will be closed to through traffic.
- Traffic devices will direct traffic through work zone.
- 2-Week Closure on Broadway (9/27 to 10/13). Broadway/Park intersection will be closed to all traffic for the final concrete paving within the intersection and on Broadway. Detour route will be provided on Thierman/Heacox, Sprague/Appleway and Vista.
- Access will be provided for property owners within the closure.
- Businesses are open.
- Contractor’s Public Liaison: Tina Westby (509) 385-4830
- Project Contact: Rob Lochmiller (509) 720-5010
N. Park (Between Indiana &Trent)
• Paving.
• Anticipated construction dates: 10/09/23
• Road closed. Signs posted.
• Project Contact: Shane Arlt - (509) 720-5002
Private Construction
N. Locust (Between Main & Sprague)
• Paving.
• Anticipated construction dates: 10/05/23 - 10/06/23
• Road closed. Signs posted.
• Project Contact: Gray Homes - (509) 868-4905
E. Valleyway (Between Moore Rd & Sonora Ln)
• Paving.
• Anticipated construction dates: 10/05/23 - 10/06/23
• Road closed. Signs posted.
• Project Contact: Eller Corporation (509) 226-0333
E. Indiana (Between Long & Greenacres)
• Paving.
• Anticipated construction dates: 10/10/23 - 10/11/23
• Road closed. Signs posted.
• Project Contact: Black Diamond Paving (509) 202-4342
Utility Work
N. Best @ Wellesley
• Pole replacement.
• Anticipated construction dates: 10/09/23 - 10/10/23
• Flaggers on site. Signs posted.
• Project Contact: Avista - Pieroni (509) 828-8121
S. Bowdish (Between Sprague and 4th)
• Gas maintenance.
• Anticipated construction date: 10/12/23
• Single lane closure. Flaggers on site. Signs posted.
• Project Contact: Avista - Trevor Butler (509) 276-0402
E. 4th Ave. and S. Felts Rd.
• Install gas service.
• Anticipated construction date: 10/09/23
• Single lane closure. Flaggers on site. Signs posted.
• Project Contact: Avista - Brett Freeman (509) 994-9290
E. Alki Ave. and N. Lake Rd.
• Install gas service.
• Anticipated construction date: 10/09/23 - 10/13/23
• Intersection closed. Signs posted.
• Project Contact: Avista - Hayden Graham (509) 795-4489
WSDOT Work
S. Barker - Between the I-90 Ramps
• Place guardrail on the east barrier.
• Anticipated construction date: 10/08/23 (9pm-2am)
• I-90 EB and WB on and off ramps will remain open.
Additional Resources
City of Spokane Valley Road Closures
Spokane County Road and Weight Restrictions
WSDOT Construction Projects
WSDOT Commercial Vehicle Services - Restrictions
National Weather Forecast - Spokane Valley
Eastern Washington Travel Alerts